![]() |
SDLC - Waterfall Model
The earliest SDLC version follows each measure always, never starting another one until the last one finishes. The drawback is that an issue with a few of those steps can postpone the entire procedure.
|
All times are GMT -7. The time now is 03:59 PM. |
Powered by vBulletin Copyright © 2020 vBulletin Solutions, Inc.